1 | SITC OF 16 Ft. PDA AT Doordarshan Kendra Mumbai | Download (2.09 MB) | 23/12/2020 - 11:00am | 31/12/2020 - 3:00pm |
2 | On Site Repair of 100 KVA, Riello make UPS, Model UPS-FT-100 at DDK Mumbai | Download (605.68 KB) | 15/12/2020 - 5:45pm | 08/01/2021 - 2:00pm |
3 | Inviting quotations for hiring of drone camera for DDk Mumbai | Download (265.16 KB) | 24/11/2020 - 3:00pm | 04/12/2020 - 3:00pm |
4 | Supply and Testing of Voltas 2 TN Split AC Condenser coil at DDK Mumbai | Download (937.09 KB) | 16/10/2020 - 2:00pm | 21/10/2020 - 2:00pm |
5 | Supply of Video Card (Qty.-1 no.) as per specifications at Doordarshan Kendra Mumbai.’’ | Download (785.61 KB) | 15/10/2020 - 12:45pm | 23/10/2020 - 2:00pm |
6 | “ Refurbishing of Overall Power Supply Board of Hitachi camera Head(Hitachi SK-HD1000E-SR No:16Z02026) at Doordarshan Kendra Mumbai.’’ | Details | 02/09/2020 - 7:45pm | 11/09/2020 - 2:00pm |
7 | ‘Non-Comprehensive Maintenance Contract (for the period of 6 months) for 240 TR Chiller (Make Daikin) Qty-01 as per Annexure -1 at DDK Mumbai.’’ | Download (2.19 MB) | 21/08/2020 - 5:15pm | 14/09/2020 - 2:00pm |
8 | '' Supply, Installation and Testing of Fibre Connectivity between Film Server Room to Earth-Station, as per scope of work; Annexure 1 '' | Download (1.84 MB) | 17/08/2020 - 1:30pm | 24/08/2020 - 2:00pm |
9 | Repairs of Antenna tracking system installed for C Band DSNG Van (Mahindra Scorpio) at Doordarshan Kendra Mumbai as per scope of work Annexure1 | Download (1.05 MB) | 24/07/2020 - 2:45pm | 06/08/2020 - 1:00pm |
10 | Repair/replacement of Spares of Hitachi Remote Control (Model:RU 1500JY) at DDK Mumbai. | Download (1.96 MB) | 22/07/2020 - 3:15pm | 27/07/2020 - 3:15pm |
11 | EPNIT03 Non Comprehensive AMC for Riello Make 60 KVA UPSs as per Annexure 1 and Annexure 2 at DDK Mumbai | Download (2.15 MB) | 22/07/2020 - 3:00pm | 04/08/2020 - 3:00pm |
12 | Supply of Adobe Premiere Pro for Team New Subscription for the period of one year (Qty:02 Nos.)as per Scope of work Annexure I | Download (3.49 MB) | 22/07/2020 - 3:00pm | 24/07/2020 - 3:00pm |
13 | NIT 22 : Non-Comprehensive Annual Maintenance Contract for Air Handling Units (16 nos.) , Fan Coil Units(10 nos.),Pump Motors(10nos.) and Cooling Towers (3 nos.) as per Annexure 1 and Annexure 2, at DDK Mumbai | Download (4.28 MB) | 18/03/2020 - 4:45pm | 08/04/2020 - 6:00pm |
14 | NIT20 : Supply of 16 Ch Multiviewer ( 2 nos.) at Doordarshan Kendra Mumbai (as per Scope of work Annex-1and echnical Compliance-Annex-3) | Download (4.11 MB) | 26/02/2020 - 11:45am | 15/03/2020 - 6:00pm |
15 | NIT21 : Non-Comprehensive Annual Maintenance Contract for Riello Make UPSs as per Annexure 1 and Annexure-2 at DDK Mumbai | Download (4.56 MB) | 26/02/2020 - 11:45am | 17/03/2020 - 6:00pm |
16 | NIT19 : Supply of UPS Spares and Repair of 100 KVA, Make- Riello , Model :UPS FT 100 as per Scope of Work-Annexure -2 and Technical Compliance Annexure-3 at Doordarshan Kendra Mumbai | Download (4.27 MB) | 26/02/2020 - 11:30am | 15/03/2020 - 11:30am |
17 | NIT18 :Renewal_of_04_nos_of_Adobe_Premiere_Pro_CC_2017_editing_software_by_latest_version_with_3_year_subscription_as_per_Annexure_1_and_Annexure_2_at_DDK_Mumbai | Download (4.05 MB) | 18/02/2020 - 5:30pm | 03/03/2020 - 6:00pm |
18 | NIT17 :''Supply, Installation, Testing and Commissioning of Air cooled - 2 x 7.5 TR or higher capacity Packaged air conditioning Unit (as per Scope of work and Specification described in Annexure-1 & Annexure-2 ) '' | Download (4.11 MB) | 29/01/2020 - 2:15pm | 17/02/2020 - 6:00pm |
19 | NIT16 :''Supply and testing of 20 input Production switcher (HD/SD)(without RCP ) ( Qty-1 no. ) at Doordarshan Kendra Mumbai as per Scope of work Annexure 1) | Download (2.1 MB) | 21/01/2020 - 4:00pm | 27/01/2020 - 11:00am |
20 | NIT15 :"Supply of 16 Ch Multiviewer ( 2 nos.) at Doordarshan Kendra Mumbai(as per Scope of work Annex-1 " | Download (2.33 MB) | 14/01/2020 - 1:00pm | 03/02/2020 - 4:00pm |